About the Project
Loyalist Township will be completing major infrastructure to the Windermere Boulevard intersection area starting this Month.
Scope of Work
The 2026 construction program will include:
- Installation of a new signalized intersection at Windermere Boulevard
- Road reconstruction
- Watermain replacement
- Storm sewer and sanitary sewer reconstruction
- New sidewalks on the south side of Main Street
- A new multi-use pathway on the north side of Main Street
- Drainage improvements, including curb and gutter
Construction Schedule
K. Mulrooney Trucking Ltd. has been contracted by Loyalist Township to complete the work.
Construction is anticipated to occur from approximately May 11, 2026 through Novemeber 2026.
Traffic and Access Impacts
During construction, residents can expect:
- Lane shifts
- Temporary gravel driving surfaces
- Flag persons directing traffic
- Delays and reduced traffic speeds
Two lanes of traffic will be maintained overnight whenever possible. Residents are encouraged to plan alternate routes and allow additional travel time during construction.
Access to Windermere drive from main street will be closed.
The Contractor will maintain access to homes and businesses whenever feasible; however, temporary driveway disruptions may occasionally occur. If access interruptions are necessary, affected residents will be contacted directly in advance to coordinate accommodations.
Residents are also asked to refrain from parking near active construction zones during working hours to help crews complete the work safely and efficiently. On certain days, driveway access and parking may be temporarily unavailable, but alternate street parking will be available. Advance notice will be provided to impacted residents.
Water and Sewer Services
The project includes replacement of watermain, storm sewer, and sanitary sewer infrastructure, along with new service connections to property lines.
Occasional water service interruptions will be required to complete infrastructure connections. Residents will receive advance notice prior to any planned shutdowns.
Garbage and Recycling Collection
Please place garbage and recycling curbside before 7:00 a.m. on collection days.
During periods where access is restricted, construction crews will relocate bins to designated collection points and return them following pickup. Residents are asked to clearly label all bins with their municipal address to assist with this process.
Accessibility
K. Mulrooney Trucking Ltd. complies with the Accessibility for Ontarians with Disabilities Act (AODA). Residents with accessibility concerns or special accommodation needs are encouraged to contact the Contractor prior to or during construction so efforts can be made to minimize disruptions.
Communication During Construction
Loyalist Township is committed to minimizing impacts to residents and businesses throughout construction. Township representatives will regularly be onsite and available to answer questions or address concerns.
Project updates will be communicated through:
- Hand-delivered notices and door-to-door notifications for time-sensitive updates
- The project webpage
- Email updates through Engage Loyalist
Residents can subscribe to project updates by selecting “Follow” at the top of this page to receive email notifications and project updates.
Project Contacts
Loyalist Township
For project-related questions or concerns, please contact:
Joe Gratton
Project Supervisor
Loyalist Township
Phone: 613-386-7351 ext. 172
Email: jgratton@loyalist.ca
Contractor Contacts
Connor Mulrooney
Site Supervisor
K. Mulrooney Trucking Ltd.
Phone: 613-453-7405
Evan Morey-Lynch
Superintendent
K. Mulrooney Trucking Ltd.
Phone: 613-561-8993
After-Hours Emergencies
For after-hours emergencies related to the project, please contact:
613-507-3069
Township staff will respond as required.
Loyalist Township appreciates the patience and cooperation of residents, businesses, and visitors as this important infrastructure improvement project moves forward.
Ask your questions about the Windermere Intersection Construction
Have a question about the project? Ask us here!
To ask a question you must create an account or log in.
These are the people that are listening and responding to your questions.
Joe Gratton
Project Supervisor
{{question.description}}